AIRSIDE RE-INSTATEMENT WORKS – LONDON GATWICK INTERNATIONAL

Hydro Turf was engaged to deliver critical airside re-instatement works around the new Boeing Hangar at London Gatwick International. The turnkey project of required services included us cultivating the temporary tac coat cover down to 300mm, dressing and grading all areas with imported BS standards topsoil prior to stabilising all areas with a mix of Flexterra High Blast and ProMatrix Low Blast specification hydroseeding in-order to meet strict CAA approval for aircraft manoeuvres to continue safely and unhindered. 

hero-aviation copy
IMG_2185
IMG_2189 2
IMG_2607
IMG_2210
IMG_2261
IMG_2613
IMG_3301